
DELCORA – Utility Water design, PA
DELCORA was experiencing several pipe failures in the utility water system that had caused outages at their sludge incineration process. Acting on the critical need
...Across a complex national network to the local level, we exceed your expectations on projects of any size.
Explore our work to see how Weston’s diverse nationwide teams may just be the partner you need on your next project.
DELCORA was experiencing several pipe failures in the utility water system that had caused outages at their sludge incineration process. Acting on the critical need
...The consent decree required that our city client perform a comprehensive evaluation of the wastewater treatment plant (WWTP) facilities and develop a rehabilitation plan and
...The City of Whiting, IN needed to replace a failing dry weather flow influent screen at its combined sewer pump station and also wanted to
...Our client is working with the EPA to ensure that the remedy selection and implementation process for a property in southern NJ accomplishes these key
...Weston has been providing critical engineering and environmental support for the protection of Hawaiian waters since 2009, managing the development of a compliance program for
...Since 2000, POLA and the City of Los Angeles have implemented extensive corrective measures to reduce sources of fecal indicator bacteria in accordance with the
...The City of Austin retained Weston to provide preliminary engineering services for approximately 15,000 linear feet of 54-inch water transmission main to connect the transmission
...Weston is currently performing a microbial source identification study at Buccaneer Beach and in the Loma Alta Creek Watershed for the City of Oceanside in
...Weston has been working with the County of Los Angeles, Department of Public Works (LADWP) for over 10 years and was selected to assist the
...